Solutions
- Installed all plumbing and waterside systems of the HVAC equipment, providing chilled water, heating water, condenser water, and condensate piping for the entire facility.
- Installed all pipe, valves, and fitting for air handling units (AHUs), energy recovery units (ERUs), fan coil units (FCUs), variable air volume systems (VAVs), and constant air volume systems (CAVs).
- Provided essential heating and makeup water, tightly integrated with the BAS to allow for seamless adjustments and optimal performance for ice and non-ice events.
- Installed two 560-ton Chillers; three, 1 MBH Natural Gas Boilers; three Mechanical Pump Skids; a Heat Exchanger; and a 1,120-ton Cooling Tower.
- Coordinated the various trades to maintain project momentum and utilized a detailed Building Information Modeling (BIM) system to create accurate installation specifications and streamline field coordination.
- Tebarco’s Senior Project Manager, Martin Hartsfield, leveraged Modigent’s national network of resources, such as IC Mechanical’s Tampa team, to expedite implementation during critical phases of the project.