Solutions
Infrastructure Integration
• Installed a new chiller that seamlessly integrated into the site’s existing plumbing and water systems, ensuring minimal disruption.
Accelerated Project Timeline
• Prefabrication of the chiller’s structural frame reduced street closure durations and expedited the overall project timeline.
Design and Functionality Alignment
• Architectural updates harmonized the chiller housing with the building’s exterior while maintaining full operational functionality.
Preventative Maintenance Enhancements
• Implemented an updated maintenance plan to ensure the system operates at peak performance with minimal interruptions.